Right-size your site's electrical capacity — up or down.
Your site’s capacity should match how you actually use energy today, and where your business is heading. Independent Energy reviews your load, your network agreement and your growth plans, then manages the upgrade or downgrade that gets the balance right.
Capacity charges are a fixed cost on your bill, paid whether you use the capacity or not. Getting it wrong costs money in either direction.
Too much capacity
You pay for headroom you never use. Sites that have downsized, changed shifts, added solar or moved equipment often carry capacity sized for a past operation.
Too little capacity
You hit limits that hold back growth, risk excess demand charges, and can’t add new plant, EV charging or electrification without a network upgrade.
THE BIGGER PICTURE
01
Actual demand
How your site operates
02
Available capacity
What the arrangement provides
03
Future needs
What the business is becoming
A decision with the context attached.
What we do
The right capacity
for the business ahead.
01
Capacity review
We analyse your interval data and peak demand against your contracted capacity to show what you need versus what you pay for.
02
Downgrades
Where capacity is oversized, we make the case to your network company and manage the reduction, lowering fixed charges.
03
Upgrades
Where capacity is a constraint, we scope the requirement, manage the application and work with the network company through to commissioning.
04
Alternatives to upgrading
Before you commit to a costly upgrade, we look at load management, solar, battery storage and on-site generation to meet demand within your existing capacity.
05
Working with the networks
We work alongside your network company on upgrades to make sure every option is explored first. New equipment, such as transformers and cabling, only goes in when it’s needed — and is positioned to avoid long cable runs, keeping costs down. You have one point of contact throughout.
How it works
How it works
Assess
We review your bills, metering data, network agreement and planned changes on site.
Recommend
You get a clear recommendation — upgrade, downgrade or hold — with the costs and savings set out.
Deliver
We manage the network application, timelines and paperwork through to completion.
Monitor
We keep tracking demand against capacity, so you know when it's time to adjust again.
Why it matters
Lower fixed costs when you stop paying for capacity you don't use.
Room to grow when expansion, new equipment or electrification needs more supply.
Better decisions backed by your own data, not estimates.
Less hassle with an experienced team managing the network company for you.
Capacity optimisation
Who this is for
Built around
your business.
Who it’s for: commercial and industrial sites, multi-site businesses, and any organisation planning a change in operations — expanding, consolidating, electrifying or adding on-site generation.
Availability
Local knowledge.
A wider perspective.
Capacity optimisation is part of Independent Energy’s site energy management service, alongside procurement, reporting, and solar and battery. Available in New Zealand, Australia, the United Kingdom and South Africa.
Talk to us about a capacity review for your site. We’ll tell you whether an upgrade, a downgrade or no change makes the most sense — and what it’s worth.